Bathroom Remodel #3
Rock
Well we are moving right along.
This last week the rock wall has come to completion.
Where we began, from a storage room where
my plants wintered.
Window trim installed
Cement board going in.
Finished trim, including over window,
and rock wall is finished.
Next up, chinking and then the floor.
Envision a double slipper tub in front of the window.
Love how it is turning out.
3 comments:
How are things going, I have been running through my blog roll and touching bases on people I use to read. Hope all is well, Sherry
I would love to see how this looks now!
I’ve never commented, but I’ve followed your blog with interest since 2007 or so.. Maybe a bit jealous of y’all’s ability to pick up and move someplace so ruggedly beautiful(!).
God Bless.
Post a Comment